A water plan for each scheme, made fresh every morning and approved by the engineer in charge.
Farmers say what they sowed, JalSuchi works out the hours each block needs, the engineer approves, and the operator runs the plan and logs what happened.
Four steps, four people
Today, and with JalSuchi
What the Department asked for, and where to see it
| The challenge asks for | What JalSuchi does | |
|---|---|---|
| Forecast irrigation demand at scheme/command-area level | Daily need for each block of each scheme for seven days, and a season outlook by fortnight for the division. | See it |
| Recommend or compare irrigation schedules | A recommended plan in hours per block, shown next to the current routine with what each block would receive under each. A re-plan when a pump or the power fails. | See it |
| Show key inputs and confidence/uncertainty where modelling is used | Every plan has a likely range, and a "why this number" page listing each input, where it came from, how old it is, and which input moves the answer most. | See it |
| Dashboards and alerts for field decision-makers | A sub-division board for the AE, a division view for the EE, and alerts to the operator and WUA by app and SMS: rain hold, pump fault, tail not reached. | See it |
| Recommendations remain decision support for authorised staff | Nothing reaches an operator until the AE approves it. JalSuchi never switches a pump or opens a gate. | See it |
Standard crop-water arithmetic, done every morning
JalSuchi uses the FAO-56 method that irrigation engineers know from project reports, and runs it every morning for each block. Every input is shown. An engineer can check any number by hand.
× Kc crop coefficient for the crop's stage (boro at panicle initiation ≈ 1.15)
+ paddy water percolation and standing water, mm/day (lower under alternate wetting and drying)
− effective rain the usable part of forecast rain
= net need, mm × area (ha) × 10 = m³ in the field
÷ efficiency canal × field (default 0.82 × 0.75, corrected from logs) = m³ at the pump
÷ measured discharge of the pumps that work (timed-volume test, m³/h) = hours of pumping
| When water is short, who goes first | Why |
|---|---|
| 1 · Paddy at panicle initiation or flowering | Stress at these stages costs the most yield, and it can't be made up later. |
| 2 · Potato and other crops at bulking or grain fill | Sensitive, but a day or two late is recoverable. |
| 3 · Vegetables mid-season | Short, light irrigations; easy to move to the next day. |
| 4 · Crops close to harvest (late mustard) | Little benefit from more water now. |
| Among equals: tail before head | Head outlets get leakage and seepage anyway. The tail is where shortages land. |
These rules are a starting point. The Assistant Engineer can reorder blocks for any day, with a reason that is kept. We'd agree the defaults with the Department's agronomists in the first three weeks.
How sure is the number
Each plan shows a likely range for the week, not one figure. The low end assumes cooler days (−8% ET₀), the wetter end of the rain forecast and the smaller of the two area figures. The high end assumes the reverse. Days whose need depends on rain with a 35% or higher chance are marked "on hold" and confirmed the evening before. The range narrows when a block's sowing return matches the satellite, and when the efficiency has been corrected from a few weeks of logs.
Where machine learning is used: only to estimate crop area and stage per block from the Sentinel-2 image series, checked against the sowing returns. The water arithmetic is plain formulae. Nothing is sent to an operator without an engineer's approval.
The weekly plan
When something breaks
Small, plain and checkable
Roles, approvals, notifications and offline field forms already run in production in Vrixaa Connect, our live platform. JalSuchi adds the water model and the plan. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.
Access by role
Operators see their scheme; AEs their sub-division; EEs their division. Sign-in by OTP. SMS commands are accepted only from registered numbers.
Every plan can be replayed
Each plan keeps the forecast, image, returns, settings and formula version it used, and every edit and approval, so it can be checked after the season.
Personal data kept small
Names and phone numbers of staff, operators and WUA contacts. No farmer-level records; plans are per block (DPDP Act 2023).
Data stays with the Department
Hosted in India, exportable at any time in open formats. Weather and satellite data used under their licences.
What we'll settle with the Department in the first three weeks
Each of these is a setting in JalSuchi, not a redesign. We'll fix them with the sub-division and the pilot schemes' operators.
- Who sets the daily pumping at each pilot scheme, and so who approves the plan: the Section Officer, the AE or the AEE.
- Hour meters on the pilot pumps, and a timed-volume test of each pump's discharge.
- The blocks and outlets of each pilot scheme, and any rotation already in use.
- Who sends sowing returns for each block: the WUA where it is active, a nominated farmer elsewhere.
- The IPMS fields and API for reading schemes and writing back plans and logs.
- Access to IMD district and block forecasts through the Department.